File list
From EVLA Guides
Jump to navigationJump to search
This special page shows all uploaded files.
Date | Name | Thumbnail | Size | User | Description | Versions |
---|---|---|---|---|---|---|
18:44, 24 January 2013 | Baseband continuum changes.png (file) | 58 KB | Akepley | 1 | ||
17:24, 16 April 2012 | Baseband frequency.png (file) | 46 KB | Akepley | 2 | ||
12:27, 13 April 2012 | Baseband frequency line.png (file) | 47 KB | Akepley | 1 | ||
19:09, 11 April 2012 | Baseband frequency line dopset.png (file) | 48 KB | Akepley | 1 | ||
23:45, 6 March 2012 | BlankFieldRMS.AC.png (file) | 64 KB | Jott | 1 | ||
23:44, 6 March 2012 | BlankFieldRMS.interlace.png (file) | 72 KB | Jott | 1 | ||
10:44, 8 April 2010 | Book.gif (file) | 1 KB | Jmcmulli | 2 | ||
11:40, 14 April 2010 | BrightnessTemp.png (file) | 8 KB | Jmcmulli | 1 | ||
12:28, 13 April 2012 | Bulk scan creation.png (file) | 99 KB | Akepley | 1 | ||
12:29, 13 April 2012 | Bulk scan edit change.png (file) | 83 KB | Akepley | 1 | ||
12:29, 13 April 2012 | Bulk scan edit confirm.png (file) | 68 KB | Akepley | 1 | ||
12:30, 13 April 2012 | Bulk scan edit select.png (file) | 82 KB | Akepley | 1 | ||
12:30, 13 April 2012 | Complex catalog search.png (file) | 192 KB | Akepley | 1 | ||
12:30, 13 April 2012 | Copy icon.png (file) | 6 KB | Akepley | 1 | ||
12:33, 13 April 2012 | Correlator name band.png (file) | 41 KB | Akepley | 1 | ||
04:08, 20 June 2012 | Doppler.png (file) | 98 KB | Jott | 2 | ||
12:33, 13 April 2012 | Doppler setting source selection.png (file) | 78 KB | Akepley | 1 | ||
12:34, 13 April 2012 | Dopset input.png (file) | 124 KB | Akepley | 1 | ||
12:34, 13 April 2012 | Dopset output.png (file) | 26 KB | Akepley | 1 | ||
16:47, 13 April 2010 | EVLA WidebandRxAvailability.png (file) | 41 KB | Jmcmulli | Figure 1: EVLA Receiver Deployment Plan. Above is a plot of the availability of the final EVLA receivers from late 2009 until the end of the EVLA Construction Project in 2012. Only final EVLA receivers are shown. Interim receivers with reduced frequency c | 1 | |
18:22, 24 August 2011 | Exposure.png (file) | 131 KB | Cbrogan | 1 | ||
02:50, 20 June 2012 | ExposureCalculator.png (file) | 191 KB | Jott | 2 | ||
17:10, 16 April 2012 | Flux cal.png.png (file) | 115 KB | Akepley | 1 | ||
18:45, 24 January 2013 | Initial continuum changes.png (file) | 136 KB | Akepley | 1 | ||
18:13, 24 August 2011 | Kalines.png (file) | 115 KB | Cbrogan | 1 | ||
11:08, 14 April 2010 | Lband sweep.png (file) | 127 KB | Jmcmulli | Figure 3: Spectrum of L-band RFI. This shows the major interfering signals seen across the full 1 GHz bandwidth available to the L-band receivers. Each of the eight “spectral windows” displays 128 MHz from a separate sub-band. These are raw data, unca | 1 | |
12:34, 13 April 2012 | Lst start range.png (file) | 27 KB | Akepley | 1 | ||
11:41, 14 April 2010 | MHI.png (file) | 9 KB | Jmcmulli | 1 | ||
12:35, 13 April 2012 | New scan.png (file) | 85 KB | Akepley | 2 | ||
15:35, 7 March 2012 | OPT-config1.png (file) | 87 KB | Jott | OPT - Instrument Configuration: Baseband settings | 1 | |
15:37, 7 March 2012 | OPT-config2.png (file) | 182 KB | Jott | OPT - Instrument Configuration: Subband Settings | 1 | |
12:35, 13 April 2012 | Opt block structure.png (file) | 11 KB | Akepley | 1 | ||
19:31, 11 April 2012 | Opt overview figure.png (file) | 151 KB | Akepley | 1 | ||
19:30, 12 April 2010 | OrionA Kspectrum.png (file) | 98 KB | Jmcmulli | 1 | ||
03:15, 20 June 2012 | PST-narrow.png (file) | 92 KB | Jott | 1 | ||
03:15, 20 June 2012 | PST-wide.png (file) | 43 KB | Jott | 1 | ||
12:37, 13 April 2012 | Paste icon.png (file) | 6 KB | Akepley | 1 | ||
12:38, 13 April 2012 | Phase calibrator copy.png (file) | 153 KB | Akepley | 1 | ||
12:38, 13 April 2012 | Phase calibrator paste.png (file) | 178 KB | Akepley | 1 | ||
12:38, 13 April 2012 | Phase calibrator search.png (file) | 35 KB | Akepley | 1 | ||
12:52, 13 April 2012 | Phase calibrator select group.png (file) | 41 KB | Akepley | 1 | ||
12:39, 13 April 2012 | Pointing setups.png (file) | 208 KB | Akepley | 1 | ||
18:48, 24 January 2013 | Polarization continuum changes.png (file) | 224 KB | Akepley | 1 | ||
12:39, 13 April 2012 | Program block.png (file) | 6 KB | Akepley | 1 | ||
15:39, 13 April 2012 | Project code.png (file) | 8 KB | Akepley | 1 | ||
17:50, 1 September 2011 | QbandMay23.ptgsol.png (file) | 111 KB | Cbrogan | 1 | ||
17:28, 15 December 2011 | RcvrAvailDec12.png (file) | 16 KB | Gvanmoor | 1 | ||
12:03, 1 September 2011 | Rmsphase April2011.png (file) | 64 KB | Thunter | 2 | ||
12:19, 1 September 2011 | Rmsphase August2011.png (file) | 71 KB | Thunter | 2 | ||
11:53, 1 September 2011 | Rmsphase December2010.png (file) | 58 KB | Thunter | 1 |