Monthly Conditions at EVLA: Difference between revisions

From EVLA Guides
Jump to navigationJump to search
Thunter (talk | contribs)
No edit summary
Thunter (talk | contribs)
No edit summary
Line 1: Line 1:
The following plots show the fraction of time suitable for observing in each EVLA band for the one-year period September 2010 - August 2011.  Click any plot to enlarge it. The simultaneous requirements for wind speed and API phase rms correspond to the current values in the OPT:
The following plots show the fraction of time suitable for observing in each EVLA band for the one-year period September 2010 - August 2011, according to the measured wind speed and API phase rms (opacity is not included).  Click any plot to enlarge it. The simultaneous requirements for wind speed and API phase rms correspond to the current values in the OPT:


{| border="1" class="wikitable" style="text-align: center;"
{| border="1" class="wikitable" style="text-align: center;"

Revision as of 17:00, 1 September 2011

The following plots show the fraction of time suitable for observing in each EVLA band for the one-year period September 2010 - August 2011, according to the measured wind speed and API phase rms (opacity is not included). Click any plot to enlarge it. The simultaneous requirements for wind speed and API phase rms correspond to the current values in the OPT:

Band: 4, P, L S C X Ku K Ka Q
API (deg) any <60 <45 <30 <15 <10 <7 <5
wind (m/s) any any any <15 <10 <7 <6 <5

Return to the High Frequency observing guide

January February March
April May June
July August September
October November December